Using the Line Simulator for Queries
In this topic, you will review how to use the line simulator for crew member inquiries.
We estimate that this will take 4 minutes to complete.
The Line Simulator allows you to simulate various scenarios with crew member's schedules. This tool can be used to validate the questions that crew members may have about their awarded pairings.
- Such scenarios include inquires about holidays, pre-awarded absences (training, vacation, leave, etc.), or pairings that were not awarded to crew members.
Detailed Explanation
Beginning on the Line Simulator tab, select the category to which the crew member in question belongs.
Click the Category dropdown button.
For this example, let's work with Las Vegas 319 captains.
Click the LAS-319-CA list item.
Click the Employee Number input field.
Enter 401398 into the Employee Number field.
Next, copy over the crew member's current schedule.
Click the Copy Line button.
Click the Add button.
Dark text indicates the current bid period. Lighter text in parenthesis indicates historical bid periods.
Next, add a pairing to this crew member's schedule to determine if it works within the current schedule.
Click the Pairing Number input field.
Now, enter the pairing number to check against employee 401398's schedule.
Enter L3013 into the Pairing Number field.
Typically, the position and date fields populate with the appropriate information. Use this dropdown to choose another date.
Click the Save button.
Now, check to see if this addition to the schedule is valid.
Click the Validate button.
Because this addition overlaps with the crew member activity "35", from January 31 through February 6, the new addition is invalid.
Click the OK button.
Now delete this addition. To do so, first hide the Add Pairing pane.
Click the Hide button.
With the line highlighted, select Delete.
Click the Delete button.
Next, modify an existing pre-assigned activity by extending activity "35" by one day.
Click the Line Identifier 35 row.
Click the Edit button.
Change the activity end date from the 6th to the 7th of February.
Click the End Date > Day dropdown button.
Click the 7 list item.
Click the Save button.
The new date is reflected in the selected bid. Now, validate the change to ensure it works.
Click the Validate button.
The simulator lets you know that the line is valid.
Click the OK button.
To check a crew member's acclimation, click Acclimation, which provides a detailed report.
Click the Acclimation button.
Click the Close button.
SUCCESS
Congratulations! You have successfully reviewed how to validate changes to a crew member's schedule.