Unlocking a run restores the run to its previous unlocked state. See the Locking Runs article for information about locking runs.
To unlock a run:
- Switch to the Run Manager tab.
- Switch to the Completed tab, if it is not currently displayed.
- Select the completed run that you want to unlock.
- Click the Set State button. A menu opens with three options: <Clear>, Locked, and Published.
- Select the <Clear> list item. The N-PBS Scheduler asks you to confirm that you want to publish the selected run.
- Click the OK button. The N-PBS Scheduler unlocks the run and Locked is removed from the State column.