Note: Clear Schedule and Start Next Bid Group and Else Start Next Bid Group are taken into consideration with Coverage Awards. If the N-PBS Scheduler cannot honor a bid preference with an Else Start Next Bid Group option due to a Coverage Award it will move to the next bid group. Also, the N-PBS Scheduler will move to the next bid group if a Clear Schedule and Start Next Bid Group bid is present and a pairing is awarded through Coverage Awards using the system-generated Award Pairings bid.
The N-PBS Bidder interface will not allow the following bids to be submitted in Standard reserve.
This bid cannot be submitted because the first Max Above is larger than the second Max Above. Else Start Next Bid Group is automatically added when you use the Max Above option.
2 Award Reserve Line bid groups, the Max Above option has a larger number in the first bid group than the second bid group
You will see the following error message at the top of your bid:
Your bid cannot be submitted. You have entered an 'Award Reserve Line' bid group with a Max Above Option. All Max Above Options on an 'Award Reserve Line Bid' must be of a higher value than the one preceding it.. Edit your bid and resubmit.
This bid cannot be submitted because the first Pairing bid group does not contain an Else Start Next Bid Group bid. If you have multiple bid groups of the same type, either Pairing or Reserve, all bid groups except for the last one must have this bid. See Else Start Next Bid Group for more information on how to use this bid.
2 Pairing bid groups, the first does not have an Else Start Next Bid Option
You will see the following message at the top of your bid:
Your bid cannot be submitted. Your bid contains multiple 'Start Pairings' bid groups. Each Pairing Bid Group that you enter, except for your last one, must contain a bid preference with 'Else Start Next Bid Group' or a 'Clear Schedule and Start Next Bid Group' bid. Edit your bid and resubmit.
This bid cannot be submitted because it contains two Award Line Reserve bid groups and the first one does not contain an Else Start Next Bid Group option. If you have multiple bid groups of the same type, either Pairing or Reserve, all bid groups except for the last one must have this bid. See Else Start Next Bid Group for more information on how to use this bid.
2 Award Reserve Line bid groups, the first does not have the Max Above Else Start Next Bid Group option
You will see the following message:
Your bid cannot be submitted. You have entered multiple 'Award Reserve Line' bid groups. All 'Award Reserve Line' bid groups, except for the last one, must have the Max Above XX option. Edit your bid and resubmit.